Multicom 016 Riello UPS - Part number: RIEYSKCC03A
40.36 USD

ضرائب الاستيراد غير مشمولة

عليك التسجيل

Multicom 016 Riello UPS - Part number: RIEYSKCC03A

Riello UPS

Interface card for the energy reserve function according to CEI 0-16, with N.O./N.C. changeover relay contact for signalling battery operation. Compatible with SEP, SDH and SDU 4000 series; parameters can be modified through UPSTools. Riello compatibility: SEP, SDH and SDU 4000. Interface card for the energy reserve function according to CEI 0-16, with N.O./N.C. changeover relay contact for signalling battery operation. Compatible with SEP, SDH and SDU 4000 series; parameters can be modified through UPSTools. Riello compatibility: SEP, SDH and SDU 4000.

شبكات MPN YSKCC03A, RIEYSKCC03A
EAN 8023251008511
رمز النظام المنسق 85049090
بلد المنشأ إيطاليا
Weight 0.8 kg

صورة المنتج هي لأغراض توضيحية فقط.
يتم توفير بلد المنشأ ورمز النظام المنسق والوصف من قبل الشركة المصنعة وقد تكون عرضة للتغيير دون إشعار مسبق. ولهذا السبب، لا يمكن تحميل شركة PLC-City المسؤولية عن أي اختلافات.
تم بيعه بواسطة PLC-CITY® وتم شحنه من إيطاليا

نحن نقبل العديد من طرق الدفع: التحويل البنكي (SEPA، ACH)، بطاقات الخصم/الائتمان (Mastercard، VISA، American Express، Diners Club، Discover، JCB، UnionPay)، PayPal، ApplePay، GooglePay، link by Stripe، Cartes Bancaires، Alipay، Bancontact، blik، eps، giropay iDeal، Przelewy24، WeChatPay.
مزيد من المعلومات حول طرق الدفع لدينا

هذا المنتج مشمول بضمان 12 شهور، صالح لعيوب التصنيع أو الأعطال. لا يغطي الضمان الأضرار الناجمة عن الاستخدام غير السليم أو الأضرار العرضية.
تعرف على المزيد حول الضمان الخاص بنا

يُشترط الحصول على موافقة مسبقة لإجراء الإرجاع، ويتم إصدار رصيد بدلاً من استرداد نقدي. الطلبات المسبقة (Backorder) غير مشمولة.

اطلع على سياسة الإرجاع الخاصة بنا

40.36 USD

ضرائب الاستيراد غير مشمولة

عليك التسجيل
تم بيعه بواسطة PLC-CITY® وتم شحنه من إيطاليا
نحن موزّع معتمد لـ Riello UPS
To الولايات المتحدة الأمريكية starting from 27.36 USD بواسطة DHL Express Worldwide
Loader...
عرض جميع خدمات الشحن

نحن نقبل العديد من طرق الدفع: التحويل البنكي (SEPA، ACH)، بطاقات الخصم/الائتمان (Mastercard، VISA، American Express، Diners Club، Discover، JCB، UnionPay)، PayPal، ApplePay، GooglePay، link by Stripe، Cartes Bancaires، Alipay، Bancontact، blik، eps، giropay iDeal، Przelewy24، WeChatPay.
مزيد من المعلومات حول طرق الدفع لدينا

هذا المنتج مشمول بضمان 12 شهور، صالح لعيوب التصنيع أو الأعطال. لا يغطي الضمان الأضرار الناجمة عن الاستخدام غير السليم أو الأضرار العرضية.
تعرف على المزيد حول الضمان الخاص بنا

يُشترط الحصول على موافقة مسبقة لإجراء الإرجاع، ويتم إصدار رصيد بدلاً من استرداد نقدي. الطلبات المسبقة (Backorder) غير مشمولة.

اطلع على سياسة الإرجاع الخاصة بنا

احصل على عرض الأسعار الشخصي الخاص بك الآن

سيساعدك مندوب المبيعات المخصص على تقديم أفضل الأسعار وأوقات التسليم.

6 متاح من الشركاء السعر والتسليم بناء على طلب الاقتباس
عليك التسجيل

معلومات المنتج

وصف

<div class="row"> <div class="col-xs-12"> <h3>CEI 0-16 interface card</h3> <p>UPS interface card designed to configure the energy reserve function required in applications complying with the CEI 0-16 standard. The card is inserted in the UPS slot and signals battery operation status through a relay with normally open and normally closed changeover contact. It is intended for medium-voltage installations where the UPS supplies interface protection systems and must guarantee residual reserve adequate for re-closing the main switch. Verified compatibility refers to SEP, SDH and SDU 4000 series according to the consulted sources.</p> <h4>Technical features</h4> <ul> <li>Function: energy reserve according to CEI 0-16.</li> <li>Relay with N.O. and N.C. changeover contact.</li> <li>Signalling of UPS battery operation status.</li> <li>Indicated compatibility: SEP, SDH and SDU 4000.</li> <li>Residual runtime values and specific logic: configurable according to documentation.</li> </ul> <h4>Integration process</h4> <p>Integration requires insertion into the UPS slot, relay connection to the protection system and verification of the runtime threshold. Testing must confirm correct signalling during battery operation.</p> <h4>Configuration software</h4> <p>The card is preconfigured, but the residual runtime value can be modified through UPSTools according to verified sources. Configuration should be performed by competent technical personnel. During commissioning, technicians should also record wiring, protection coordination, alarm mapping and final operating settings so that future maintenance can reproduce the same safe operating conditions. This approach improves traceability in professional installations and supports correct interaction between the accessory, the UPS and the protected load.</p> <h4>Riello compatibility</h4> <p>The Riello compatibility or reference series is: SEP, SDH and SDU 4000.</p> </div> </div> <div class="row"> <div class="col-xs-12"> <h3>CEI 0-16 interface card</h3> <p>UPS interface card designed to configure the energy reserve function required in applications complying with the CEI 0-16 standard. The card is inserted in the UPS slot and signals battery operation status through a relay with normally open and normally closed changeover contact. It is intended for medium-voltage installations where the UPS supplies interface protection systems and must guarantee residual reserve adequate for re-closing the main switch. Verified compatibility refers to SEP, SDH and SDU 4000 series according to the consulted sources.</p> <h4>Technical features</h4> <ul> <li>Function: energy reserve according to CEI 0-16.</li> <li>Relay with N.O. and N.C. changeover contact.</li> <li>Signalling of UPS battery operation status.</li> <li>Indicated compatibility: SEP, SDH and SDU 4000.</li> <li>Residual runtime values and specific logic: configurable according to documentation.</li> </ul> <h4>Integration process</h4> <p>Integration requires insertion into the UPS slot, relay connection to the protection system and verification of the runtime threshold. Testing must confirm correct signalling during battery operation.</p> <h4>Configuration software</h4> <p>The card is preconfigured, but the residual runtime value can be modified through UPSTools according to verified sources. Configuration should be performed by competent technical personnel. During commissioning, technicians should also record wiring, protection coordination, alarm mapping and final operating settings so that future maintenance can reproduce the same safe operating conditions. This approach improves traceability in professional installations and supports correct interaction between the accessory, the UPS and the protected load.</p> <h4>Riello compatibility</h4> <p>The Riello compatibility or reference series is: SEP, SDH and SDU 4000.</p> </div> </div>

مواصفات تقنية

Type of accessory/spare part
Other

مراجعات شركتنا