Free express shipping to Europe, USA and Canada on web orders over €150 (up to 10kg).
info
Explore
-
MenuBack
-
Brands
-
- Technologies for :
-
Industry
-
-
Building
-
-
Electrification
-
-
Tools
-
- Contact Us
- About Us
- Promo
contact info
-
PLC-City
Via Circumvallazione esterna 12
80025 Casandrino NA
Italy
Menu
GX20121U - Lovato - Cam switch
Lovato
7GN series cam switch, general configuration, 2 poles, front mounting, front plate 48x48 mm. 7GN series cam switch, general configuration, 2 poles, front mounting, front plate 48x48 mm.
MPNs GX20121U, LOVGX20121U
EAN 8013975182765
HS Code 85365080
Country of origin Croatia
Weight
0.34 kg
The product image is for illustrative purposes only.
The country of origin, HS code, and description are provided by the manufacturer and may be subject to change without prior notice. For this reason, PLC-City cannot be held responsible for any discrepancies.
Sold by PLC-CITY® and shipped from Italy
Secure payments
& many more
We accept many payment methods: Bank Transfer (SEPA, ACH), Debit/Credit Cards (Mastercard, VISA, American Express, Diners Club, Discover, JCB, UnionPay), PayPal, ApplePay, GooglePay, link by Stripe, Cartes Bancaires, Alipay, Bancontact, blik, eps, giropay iDeal, Przelewy24, WeChatPay.
More information about our payment methods
12 Months warranty
This product is covered by a 12 Months warranty, valid for manufacturing defects or malfunctions. The warranty does not cover damage caused by improper use or accidental damage.
Learn more about our warranty
Returns available within 30 days
Returns are subject to prior authorization and eligible for store credit only. Backordered items are excluded.
Product information
Description
<h3>Cam switch for manual control</h3><p>This cam-switch component is used for manual selection, switching or accessory completion in control panels and machine interfaces. It supports clear operator commands where a maintained mechanical position must correspond to a defined electrical function.</p><h4>Technical role and wiring data</h4><p>function general configuration; component type cam switch; poles 2; mounting front mounting. Selection must follow the contact configuration, actuation type, supply data and the role assigned in the machine sequence. The device should be wired so that command, feedback and safety-related signals remain readable in the electrical diagram and easy to check during maintenance.</p><h4>Commissioning and maintenance</h4><p>During commissioning, test the real operating movement, verify terminal response and compare the result with the machine logic. For replacement, keep the same function, contact layout and actuation principle, then repeat the test before returning the panel or workstation to service.</p><p>The installation should also define how the operator identifies the command state on the panel, machine or workstation. Clear marking, consistent terminal numbering and a documented functional test reduce ambiguity when several similar control devices are installed close to each other.</p><p>During service, compare the installed device with the electrical diagram before changing wiring or replacing parts. The check should cover contact assignment, actuation direction, mechanical return and any accessory used for protection, locking or manual operation.</p><p>The final acceptance check should be made with the actual operator action and with the downstream machine response visible. This confirms that the command element, the wiring and the controlled function remain aligned.</p>
<h3>Cam switch for manual control</h3><p>This cam-switch component is used for manual selection, switching or accessory completion in control panels and machine interfaces. It supports clear operator commands where a maintained mechanical position must correspond to a defined electrical function.</p><h4>Technical role and wiring data</h4><p>function general configuration; component type cam switch; poles 2; mounting front mounting. Selection must follow the contact configuration, actuation type, supply data and the role assigned in the machine sequence. The device should be wired so that command, feedback and safety-related signals remain readable in the electrical diagram and easy to check during maintenance.</p><h4>Commissioning and maintenance</h4><p>During commissioning, test the real operating movement, verify terminal response and compare the result with the machine logic. For replacement, keep the same function, contact layout and actuation principle, then repeat the test before returning the panel or workstation to service.</p><p>The installation should also define how the operator identifies the command state on the panel, machine or workstation. Clear marking, consistent terminal numbering and a documented functional test reduce ambiguity when several similar control devices are installed close to each other.</p><p>During service, compare the installed device with the electrical diagram before changing wiring or replacing parts. The check should cover contact assignment, actuation direction, mechanical return and any accessory used for protection, locking or manual operation.</p><p>The final acceptance check should be made with the actual operator action and with the downstream machine response visible. This confirms that the command element, the wiring and the controlled function remain aligned.</p>
Technical specifications
- Degree of protection (IP)
- IP65
- Number of contacts as normally open contact
- 4
- Type of electric connection
- Screw connection
- Material front ring
- Plastic
- Type of control element
- Short thumb-grip
- Number of switch positions
- 11